Chamber L-C (V-2)

Path-Ensemble Entropy · Stress-Gated Utility
AXIS V · LOGIC CONTAINER L-C · MECHANISM V-2
Ready to run
Current Step
0
Current S_t
0.000
Current q_t
0.000
τ Admissible
Threshold Crossed
Utility Realized
Utility Step
Current U_t
0.000

Timeline Visualization

Validation Statistics (Batch Mode)

Total Runs
0
Mean t_crossed
P(utility | τ gate)
Mean final q
Falsifier Triggers
0
Upgrade Decision: PENDING

Chamber Specification

Invariant: S(H) = path-ensemble entropy reduction (counterfactual structure)
Falsifier: Utility realized before S ≥ S_crit
Expected Signature: Ensemble reorganization then utility (C_u) — delayed onset
Coupling Rule: τ admissible iff S_t ≥ S_crit (no collapse, gated realization)
Utility: Shared EMA threshold (k=8 consecutive steps above U_crit)
Ensemble: K rollouts × L lookahead steps → binary entropy of utility predictability