Chamber L-B (V-4)

Spectral Invariants · Instantaneous Feasibility
AXIS V · LOGIC CONTAINER L-B · MECHANISM V-4
Calibration Protocol Active: Start with wide band (Phase 1) → Extract λ envelope → Define neutral test band
Ready to run - wide band mode
Current Step
0
λ_max(A)
Spectral Feasible
Utility Realized
Current U_t
0.000
Violation Step
Utility Step
Band Width

Timeline Visualization

Validation Statistics (Batch Mode)

Total Runs
0
P(utility | in band)
P(utility | out band)
Mean Cliffness
λ Envelope
Falsifier Triggers
0
Upgrade Decision: PENDING

Chamber Specification

Invariant: F(H) = (λ_low ≤ λ_max(A(H)) ≤ λ_high) — boolean spectral band on adjacency matrix
Falsifier: Utility realized outside spectral band (λ_max ∉ [λ_low, λ_high])
Expected Signature: Brittle spectral window (B_u) — micro-edits annihilate utility
Coupling Rule: τ admissible iff F.feasible == true (irreversible collapse)
Utility: Shared EMA threshold (k=8 consecutive steps above U_crit)
Spectral Operator: Adjacency matrix A(H) — directed, unweighted